Showing posts with label penang. Show all posts
Showing posts with label penang. Show all posts

Tuesday, May 29, 2012

CIQ - Customs, Immigration & Quarantine

Butterworth is going to have a CIQ soon but until Barisan Nasional takes over the state of Penang. Penang was a tax free island until Barisan Nasional took it away many years ago. And now they are talking about giving this small shit along the Butterworth coast. Then we have article of how they are sabotaging Penang here. Can't believe politicians are screwing up Penangites. Are we so cheap and can be bought? We want clean and fair policy. We want Bersih! Read more below.....


May 29, 2012
CIQ complex mooted for Butterworth
By KOW KWAN YEE
Star

PENANG will be transformed into an international logistics hub with the development of a Customs, Immigration and Quarantine (CIQ) complex on a 1,214ha land in the Butterworth coastal area.

Penang Port Sdn Bhd (PPSB) chairman Datuk Seri Dr Hilmi Yahaya said the tax-free zone project, of which the cost had yet to be estimated, would be potentially built on reclaimed land.

He said more than 100,000 new job opportunities would be created with commercial complexes, hotels, petroleum tank farm as well as dockyard services being developed under the project.

“Foreigners especially those from Thailand, Indonesia, India and the Middle East could stay at the hotels and have their activities at the CIQ designated areas, without paying taxes,” Dr Hilmi said.

He added that the project was aimed at transforming Penang into a vibrant logistics hub which focused on the service sectors.

He said the state was oversaturated with manufacturing activities and it was crucial to consider other industries to stimulate the economy.

“To cater to the industrial needs, packaging services will be provided at the CIQ for unfinished goods from manufacturing-based countries such as China,” he told a press conference at the state Barisan Nasional office in Bayan Baru yesterday.

Dr Hilmi said the project would kick off once the Finance Ministry gave the green light.

However, when asked about the completion schedule, he said the project would be completed earlier should Barisan take over the state in the coming general election.

“The PPSB has submitted the proposal to the Ministry two weeks ago and we are waiting for the approval,” he said.

Penang Barisan chairman Teng Chang Yeow lauded the proposal as it would complement the proposed Penang’s free port status.

Teng said in a statement that the free port status was still at discussion stage as the state Barisan was in the process of meeting business organisations and associations here to obtain their feedback.

“We will formulate a comprehensive and conclusive proposal of the free port once the discussion is completed,” he said.

Sunday, April 8, 2012

Seberang Prai Local Plan 2020 Draft

The Seberang Prai Local Plan 2020 Draft is now being exhibited at 3 locations - MPSP HQ in Bandar Perda, Bukit Mertajam, the north and central Seberang Prai district offices, and the Town and Country Planning Department office at Level 57, Komtar, George Town. The exhibition is open from 9am to 5pm on Mondays to Fridays.

Surprisingly only 2 districts have the local plan while the SPS (South Seberang Prai) has no plan. Is there something wrong? Why the speed to pass the north and central plan before the south materializes?

Some interesting tourism plan from a report from Star on 28 March 2012:-

SEBERANG Prai, which has long been treated as a ‘stepchild’ in tourism promotions in Penang, will soon have new tourism products to give the mainland a major economic boost.

A host of tourist destinations and related activities have been identified for inclusion in the state’s tourism map.

According to the North Seberang Prai Local Plan 2020 Draft, an Archeo-Tourism Trail, Heritage Trail and Beach Recreation Trail would be developed in the district in the next eight years.

The Archeo-Tourism Trail would encompass an old fort at Kota Kuala Muda, an archaeology complex in Sungai Emas, the Langkasuka ruins in Kota Aur, an early archaeology site in Guar Kepah, a candi (temple) in Permatang Pasir, the Merdeka Bridge-cum-fort in Bumbung Lima and a border cornerstone in Ekor Kucing.

The Heritage Trail would start from the Butterworth railway station through the Sultan Abdul Halim ferry terminal, a traditional blacksmith shop in Permatang Benuan, the Capal Jago chapal maker’s shop in Kepala Batas and ends at the whispering market in the Kuala Muda fishing village.

The Beach Recreation Trail would cover the Pantai Bersih beach, Bagan Ajam beach, Pantai Teluk Molek (Robina Park) beach, Teluk Air Tawar recreation park, Kuala Bekah beach, Pantai Penaga, Sungai Muda sanctuary park, Pantai Kamloon recreation park, Bertam Vision Park, Padang Cempedak recreation park and Air Hitam Dalam recreation park.

Over in central Seberang Prai, several tourism products have been outlined in the Central Seberang Prai Local Plan 2020 Draft.

In Seberang Jaya, there are proposals to upgrade the Penang Bird Park and the Seberang Jaya expo site apart from preserving heritage buildings in Kg Dock.

A rural homestay project has been proposed in Sama Gagah, Permatang Pauh, while an education-based tourism with MICE facilities would be promoted in Jalan Permatang Batu, Prai.

Juru would feature the Kg Sungai Semilang-Dataran Semilang-Pulau Aman-Pulau Gedung tourism trail, homestay programmes in Kampung Juru, recreational activities at the Bukit Juru recreational forest and visits to the Permanent Food Production Park.

Juru would also see the preservation of Masjid Lama Kampung Bukit Kechil, the upgrading of facilities at the Dataran Semilang seafood restaurants and the construction of a tourism-based neighbourhood centre in Kampung Bagan Nyior.

Facilities at the Highway Auto-City Juru commercial centre would also be upgraded.

In Kubang Semang, Penanti, an old musalla (surau) would be preserved, while the Madrasah Manabi’ululum Kubang Ulu would be upgraded to an international centre for Islamic studies.

The homestay programmes in the Mengkuang Titi traditional village and Kampung Kubang Semang would also be further enhanced.

Eco-tourism facilities would be intensified at the Mengkuang Dam, while the Cherok Tok Kun recreation forest park would be upgraded with more infrastructure facilities.

Bukit Mertajam town would be generally promoted as a shopping haven, while the old buildings there would be retained for aesthetic and heritage value.

The people can view both local plan drafts which are currently on public display, since March 15, until April 12.

Saturday, March 24, 2012

Cyber City

March 24, 2012
Bertam to be Cyber City 2
By DERRICK VINESH
Star

BERTAM town in Kepala Batas will be developed as the second Penang Cyber City (PCC 2) by 2020, following the declaration of the Bayan Lepas/ Bayan Baru industrial hub as the state’s first cyber city back in 2005.

The PCC 2 would lead in research and development (R&D) activities, especially in Information and Communications Technology (ICT), provide world-class ICT infrastructure and be a catalyst for development in Kepala Batas.

According to the North Seberang Prai Local Plan 2020 Draft, the Kepala Batas-Bertam-Kubang Menerong enclave has also been identified as one of four development corridors as outlined in the Penang Structure Plan 2020.

The other three corridors are Butterworth-Bagan Ajam-Teluk Air Tawar (including Sungai Dua) enclave, Penaga-Kuala Muda enclave and Tasek Gelugor-Ara Kuda enclave.

Former Prime Minister Tun Abdullah Ahmad Badawi, who is Kepala Batas MP, first declared the launch of Penang Cyber City (PCC 1) on Jan 29, 2005.

At that time, former Penang Chief Minister Tan Sri Dr Koh Tsu Koon had said that the state government had plans to establish two more cyber cities by 2008, one in Bertam and another in Batu Kawan.

The Bertam township, which is home to a number of educational institutions and Federal Government offices and agencies, would also be developed as a special industrial centre, a semi-regional centre and as north Seberang Prai’s district administrative centre.

Apart from emerging as a Centre for Excellence in Higher Education, Bertam would also be home to a cluster of companies in the automotive industry and an integrated farming-cum-processing centre.

The draft says that more landed property is encouraged in the township compared to high-rise buildings according to the suitability of the land area there.

To further enhance public transportation in Bertam, an integrated monorail service has been proposed to connect Kepala Batas with Bagan Ajam, Butterworth, Sungai Dua and Tasek Gelugor.

The North Seberang Prai and Central Seberang Prai Local Plans 2020 Draft are currently on display for public viewing and feedback since March 15 till April 12.

The documents are available at the MPSP headquarters in Bandar Perda here, the north Seberang Prai and central Seberang Prai district offices and at the Town and Country Planning Department office on Level 57, Komtar, George Town.

The exhibition is open from 9am to 5pm on Monday to Friday.

Visitors can buy copies of the local plan drafts, which are available in CD-ROM format, at RM10 each.

Thursday, December 15, 2011

Apollo Market - Penang's Biggest Market

December 16, 2011
New roof after 30 years
Star

Better facility: The new roofing at Apollo Market on Jalan Raja Uda, Butterworth.

PENANG’s biggest market — Apollo Market — on Jalan Raja Uda has been given a facelift with new roofing installed at two of its three segments.

Chief Minister Lim Guan Eng said he channelled RM185,000 from his Bagan Member of Parliament’s allocation funds towards the project, which was recently completed.

“For the last 30 years, there had been no renovation work done to this market, despite it being the biggest in the state.

“I have asked the Seberang Prai Municipal Council to get a quota- tion for new roofing to be installed at the market’s third segment by Chinese New Year next month,” he said after visiting the market on Wednesday.

Lim said there were about 500 hawkers trading there.

He said he was pleased with work on the roofing, adding that the hawkers no longer needed to worry about leaking roofs during a downpour.

Batu Kawan Industrial Expansion

December 16, 2011
Industrial frontier expanded in Batu Kawan
Star

THE state has expanded the industrial land in Batu Kawan, Penang, to accommodate demand from investors as Bukit Minyak Industrial Estate and Penang Science Park in Seberang Prai have been fully taken up.

Chief Minister Lim Guan Eng said the state had expanded the industrial land in Batu Kawan to 1,619ha.

“When completed, the Penang Science Park, which is located in Bukit Minyak, will be the country’s largest technology park.

“The state has plans to turn Batu Kawan into a satellite town, just like Bayan Baru and Seberang Jaya,” he said at the opening of the Ixora Hotel in Bandar Prai Jaya in Butterworth on Wednesday.

Also present were Indonesian Consulate-General Chilman Arisman, Deputy Chief Minister II and Batu Kawan MP Dr P. Ramasamy, state exco member Lim Hock Seng, hotel managing director Datuk Ng Swee Chin and general manager Winston Toh.

Strategically located along Jalan Baru, the 326-room hotel is right next to Megamal Pinang and within walking distance to shops, restaurants and cafes. It is also close to an industrial estate.
Be our guest: Receptionists Chou Tze Xien and Shazmira Abd Rahim showing the welcome gesture at the front desk.

Lim said the first phase of eco-tourism projects in Batu Kawan, which involved the Batu Musang jetty, had been completed while the second phase involving the construction of a seafood centre, gallery and chalets was under construction.

Ng said he decided to name the hotel after a flower.

“Our aim is to provide extraordinary services to our customers,” he said.

Toh said 90% of the hotel staff were locals, adding that they aspired to make Ixora one of the best hotels in Penang.

Friday, April 29, 2011

Sea Tunnel Link

November 14, 2011
Gurney Drive land swap deal for developers of highways, sea tunnel link
By JOSEPH KAOS Jr
Star

KUALA LUMPUR: The Penang government will pay developers with prime land around the tourist belt area of Gurney Drive to construct three by-pass highways and a sea tunnel linking the island to the mainland.

Chief Minister Lim Guan Eng said the RM8bil project would be the state's biggest infrastructure exercise and is meant to resolve the island's severe traffic congestion problem.

The proposed traffic-alleviation projects are a 6.5km sea tunnel connecting Gurney Drive on the island to northern side of Butterworth, a 4.2km road from Gurney Drive to the Tun Dr Lim Chong Eu expressway by-passing the city centre, a 4.6km road linking Bandar Baru Air Itam to the same expressway and a 12km dual-carriage road from Tanjung Bungah to Teluk Bahang to pair with the existing coastal road.

“We estimate that the projects will cost RM5bil to RM8bil depending on the bids from prospective contractors,” he told a press briefing here yesterday.

He said the “competitive land swap” payment will be a win-win situation for both the state government and the developers.

“The state government does not have to pay money and the developer gets prime land that will triple in value after the projects take place,” Guan Eng said.

He added that developers could also propose to implement toll payments to recover costs.

A pre-qualification exercise will be issued Tuesday on the Penang government website for the projects and a briefing will be held in Penang on Nov 29 for interested bidders.

Lim explained that the projects would undergo a lengthy feasibility study and construction is only expected to commence in 2015.

“We target the completion to be in 2020, although it can be completed earlier,” said Lim.

------------

Friday April 29, 2011 MYT 2:44:00 PM
Sea tunnel link for Penang?
By ANDREA FILMER
Star

GEORGE TOWN: Penang may get a third link - a 6.5km sea tunnel linking Gurney Drive on Penang island and Bagan Ajam on the mainland.

Chief Minister Lim Guan Eng said the project was proposed by the Chinese company Beijing Urban Construction Group Co Ltd (BUCG), which built the famous Bird's Nest Olympic stadium in Beijing.

He said a memorandum of understanding (MoU) was signed between the state and BUCG on Thursday in Putrajaya, in the presence of Prime Minister Datuk Seri Najib Tun Razak and Chinese premier Wen Jiabao.

"To get China's attention is a compliment for Penang," Lim told reporters here Friday after the opening of the state assembly sitting by Yang di-Pertua Negri Tun Abdul Rahman Abbas.

Lim said the Penang Municipal Council would embark on a six-month study to ascertain the technical, physical and funding requirements for the project.

He added that although BUCG had proposed the third link, the project would have to be awarded through an open tender.

On Thursday, eight agreements and MoUs were signed between Malaysia and China.

One of the MoU, on resolving traffic congestion in Penang island, was between the Penang Government and BUCG, which was signed by Penang state secretary Datuk Farizan Darus and company chairman Liu Longhua.

It is not known yet whether the third link was specifically mentioned in the MoU.

------

Wednesday May 11, 2011
Tunnel proposal to be studied carefully first, says CM
Star

THERE is no guarantee that the proposed 6.5km tunnel project linking Gurney Drive on Penang island and Bagan Ajam on the mainland would be implemented.

Chief Minister Lim Guan Eng said he was not sure if the project would materialise but the state government would give it a try.

“All technical studies including hydrology test would be carried out by experts. The green lights will only be given if everything is done properly,” he said in his winding up speech at the state assembly.

He was replying to a query by acting Opposition leader Datuk Seri Dr Hilmi Yahaya (BN-Teluk Bahang) who raised his concern over the project.

“Since a credible company Beijing Urban Construction Group (BUCG) has approached us, we can’t just simply chase them away,” Lim said.

He said the state would ensure there would be an open tender if the project goes ahead.

The tunnel which was proposed by BUCG stemmed from a memorandum of understanding between BUCG and the state government which was signed in Putrajaya.

It was one of eight agreements signed between Malaysia and China in the presence of Prime Minister Datuk Seri Najib Tun Razak and Chinese premier Wen Jiabao on April 28.

Tuesday, October 12, 2010

MPSP - from deficit to surplus

MPSP is the administrative council overseeing the running of mainland Penang. This is something that rakyat of Butterworth will be proud of with the new Pakatan Government. Read the story by Romerz below:-

Slightly more than two years ago, Majlis Perbandaran Seberang Perai (MPSP) was ailing financially. Remember MPSP having to absorb responsibility for the white elephant called the Batu Kawan stadium built by the previous administration despite protests from local civil activists? Remember the over-priced spanking new MPSP building which cost them RM80 million when the same building could have been built at under RM40 million?

The MPSP was a different creature all together then. Then it was a creation of corrupt politicians (and their appointees) who wielded the reigns of power in Penang. But thankfully not anymore since 2008.

Just to give you an idea about MPSP's finances, look at the chart below.

MPSP Surplus/(Deficit)
2000 - (RM5.1 million)
2001 - (RM31.2 million)
2002 - (RM36.7 million)
2003 - (RM39.0 million)
2004 - (RM48.9 million)
2005 - (RM57.1 million)
2006 - (RM5.4 million)
2007 - (RM5.1 million)
2008 - RM3.0 million
2009 - RM14.6 million
2010 - RM54.39 million (as at 4 October 2010)

Now tell me who are the better administrators, where public money is concerned and should be used for the public, and those who regard public money as "loot" to be shared amongst themselves and their cronies?

Imperfect as Pakatan Rakyat may be at the moment, at least they don't steal from us and the public's money is being protected and enhanced by appointed professionals! To the detractors of PR, yes I agree their problems may be unpalatable to many of us who yearn for meaningful change from race politics and self-interests but surely they are the ONLY choice when we only have a rock and a hard place to choose from, given the present electorate's indifference and ignorance.

Friday, January 18, 2008

Penang Sentral

Wednesday May 26, 2010
Phase one of RM2bil Penang Sentral project can’t be ready by July 2011
By DERRICK VINESH
Star

CONSTRUCTION work on the first phase of the RM2bil Penang Sentral transport and logistics hub may not meet its July 2011 completion deadline due to delays in land acquisition.

MRCB Utama Sdn Bhd project manager (project/property) Zamri Mat Zain said the company was still in the midst of negotiating with several stakeholders on land acquisition and land alienation matters.

“Phase 1 and Phase 1A of the project involve land belonging to the Railway Authority Commission (RAC), Malaysian Highway Authority (MHA) and the state government.

“We are working closely with both the Federal Government and state government to expedite the matter,” he said during a meeting between Penang Port users and Transport Minister Datuk Seri Ong Tee Keat recently.

Zamri said the delay was basically due to the land acquisition process which was expected to take some time to settle.

He, however, said the other areas of the project’s development were going on well.

Last November, MRCB executive director Datuk Zaki Zahid had said that work on the Penang Sentral project, covering 12ha of land near the Butterworth ferry terminal, was expected to take off this year.

Zaki also said that the project’s first phase costing RM300mil, which involved the construction of permanent bus and taxi terminals with access to the railway station and ferry terminal, along with retail outlets, was to be completed by 2011.

The second phase, which would comprise a commercial hub, including office towers, service apartments, a hotel and waterfront amenities, was scheduled for completion by 2015.

The Penang Sentral project, developed by Malaysian Resources Corporation Berhad (MRCB) in partnership with Pelaburan Hartanah Bumiputera Berhad (PHBB), is part of the Northern Corridor Economic Region (NCER) initiative.

Both companies formed a joint venture company, called Penang Sentral Sdn Bhd, which would undertake the development of the transport and commercial hub.

MRCB Selborn Corporation Sdn Bhd, a subsidiary of MRCB has been appointed to manage the development, design, construction, completion and maintenance of Penang Sentral.

Designed by local company, Veritas Architects, the state-of-the-art Penang Sentral project was launched by former Prime Minister Tun Abdullah Ahmad Badawi on July 31, 2007.

The transport hub is expected to cater to approximately 65 million passengers a year.

A RM5mil temporary bus terminal was completed near the project site in March 2008.

The former bus terminal, sited at the Penang Port Commission (PPC) Complex, could not be used after fire razed the complex in May 2001.

A recent check by The Star at the project site showed that apart from being used as a temporary bus depot, there were no signs of construction work in progress.

----

Construction of Penang Sentral to start next year
November 17, 2009
Star

CONSTRUCTION work on the RM2bil Penang Sentral project in Butterworth is expected to kick off next year.

Malaysian Resources Corp Bhd (MRCB) executive director Datuk Zaki Zahid said land acquisition, which was progressing smoothly, would take some time to be completed.

He said MRCB and Pelaburan Hartanah Bumiputera Berhad (PHBB) were discussing matters with the land stakeholders which included the state and Federal Governments and also Penang Port Sdn Bhd.

“The project will kick off with the construction of an integrated transport terminal,” he said.
“We are in discussion with the Transport Ministry and the Economic Planning Unit through the Northern Corridor Authority to obtain the funds,” he told reporters after presenting uniforms, bags and school items to 300 students from three schools in Penang. He added that the three schools were adopted by MRCB under the Pintar programme.
He said the first phase of the Penang Sentral project costing RM300mil involving the building of bus and taxi terminals along with retail outlets was expected to be completed by 2011.
The subsequent phases of the projects will be developed by MRCB and other investors, with the whole project expected to be completed by 2015.
-------------
Jan 20, 2009
Star
Penang Sentral project hits another snag

By DERRICK VINESH

BUTTERWORTH: The RM2bil Penang Sentral transportation and logistics hub project has hit another snag with the Seberang Prai Municipal Council unsure of where to relocate 66 licensed hawkers.

The new temporary hawker centre would make way for a car park and an access road under the project.

State Public Works, Utilities and Transportation Committee chairman Lim Hock Seng said the hawkers would be “homeless” for about six months to allow the construction of the car park and access road.

“The council had earlier agreed to surrender the piece of land, now occupied by the temporary hawker centre, some six months before issuing the certificate of fitness for the project’s phase one development.
“So if the council fails to surrender the land in time, it would be in breach of contract. If it does surrender the land as per the contract, where will the hawkers go?” he said on Tuesday.
Lim said the hawkers used to run their business legally at the former Penang Port Commission Complex until fire gutted the building in May 2001. He said they were then promised top priority to rent units in the project’s permanent building that would be constructed under phase one.
The project’s first phase involved the construction of permanent bus and taxi terminals with access to the railway station and ferry terminal, and was slated for completion by July 2011.
Lim said the council and the project developers -- Malaysian Resources Corp Bhd and Pelaburan Hartanah Bumiputra Bhd -- were presently trying to find an amicable solution.
He noted that the actual work on the Penang Sentral project had not begun because planning approval for its phase one development had yet to be finalised.
So far, only a RM5mil temporary bus terminal and the temporary hawker centre have been completed, he said.
---------
Penang Sentral to take shape next year
Saturday July 19, 2008 MYT 8:01:18 PM
Staronline
By YENG AI CHUN

BUTTERWORTH: Construction of the RM2bil Penang Sentral project will start in the first quarter of next year, said Second Finance Minister Tan Sri Nor Mohamed Yakcop.
He said the transportation hub for Penang and the Northern Corridor, comprising an integrated terminal for rail, road and sea travel, would be constructed in two phases, with the first to be completed in 2011.
“The first phase is the transportation hub while the second phase is the commercial hub.
“The completion of the second phase depends on the viability (of the project) but I think it might be completed before 2015,” he said Saturday after launching of the Penang Sentral temporary bus terminal here.
Nor Mohamed said the first phase comprises terminal lanes for buses, taxis and several floors of retail space.
“We would unveil the conceptual plan during the groundbreaking ceremony. The plan has yet to be approved by the Seberang Prai Municipal Council,” he said.
Earlier, Nor Mohamed said the completion of the RM5mil temporary terminal was a sign that the Federal Government is committed in providing an efficient and quality public transport to the masses.
Nor Mohamed added that the Penang Sentral project has long been discussed even before it was included as a Northern Corridor project.
“In the issue of Penang Sentral, we see close cooperation between the State Government and Federal Government," he said.
Present at launch was state Public Works, Utilities and Transportation Committee chairman Lim Hock Seng, Seberang Prai Municipal president Farizan Darus, Penang Sentral Sdn Bhd chairman Kamalul Arifin Othman, Malaysian Resources Corporation Berhad chairman Datuk Azlan Zainol and Pelaburan Hartanah Bumiputera Bhd chairman Tan Sri Md Nor Md Yusof.

The construction of the bus terminal which began in August 2007, was completed in January this year. The terminal has 28 bus platforms and 46 taxi bays and is designed to handle up to 4,500 passengers per day.
--------------

Source : The Star
Thursday November 22, 2007
Penang Sentral to take shape
By YENG AI CHUN

BUTTERWORTH: Work on the RM2bil Penang Sentral project here will start next month.
The transportation hub, to comprise an integrated terminal for rail, road and sea travel, will be undertaken by Malaysian Resources Corp Bhd (MRCB) and Pelaburan Hartanah Bumiputra Bhd.

Penang Port Sdn Bhd managing director Datuk Ahmad Ibnihajar said the transportation terminal would be completed within two to three years.

“The temporary transportation terminal will be ready for occupation in January next year,” he said after presenting ISO 9001:2000 award certificates to PPSB’s corporate services unit and strategic business units here yesterday.

A RM5mil temporary building is being built to ensure that bus services would not be disrupted when work on the transportation and logistic hub begins.

The facilities for Penang Sentral will mirror Kuala Lumpur Sentral and on top of the transportation terminal, there will be a development of commercial and residential properties on the 12.8ha site.

The site of the project was once the Butterworth bus terminal before it was razed in a fire in 2001.

Ahmad also told reporters that Penang Port would welcome any organisation that was interested in providing additional sea transport to complement the current existing ferry services.

Integrated terminal: Penang Sentral is modelled after Kuala Lumpur Sentral.

“If there is an organisation which is willing to provide water taxis or high-speed ferry services as suggested in the Northern Corridor Economic Region (NCER) blueprint, we welcome them,” he said.

When asked if Penang Port would increase ferry fares as it was running at a loss of RM1mil every month, Ahmad replied that the government would know how to plan.
“What the government needs to do is have better car park facilities for the park and ride concept and the (sea) water has to be cleaned up.

On another matter, Ahmad said Penang Port did not suffer any loses during the 90-minute power failure that hit the state on Tuesday.

“The power failure lasted about an hour but we had our generator set and UPS (uninterruptible power supply) to back us up. The port was not affected,” he said.

Saturday, November 17, 2007

My Home - Butterworth

My hometown is Butterworth. And I am going to share with you everything about mainland Penang.

Where is Butterworth?


Butterworth is mainland Penang. Penang is a state in Malaysia. The state of Penang consists of Penang Island and mainland Seberang Perai. Seberang Perai is also known as Butterworth.





Many tourists visit Penang Island but they hardly know and visit Butterworth. Butterworth has a lot to offer. No where else in Malaysia can you find such a rich diverse district.

There are so much to see in Butterworth. If you are a tourist, you will probably know Butterworth by the only Penang Bird Park in Butterworth.

We have Ferry, Whalves, Railway Station, Airport, Hill, Beaches, Industrial Estates, Dams, highways and many more. In this blog, I am going to showcase all the pictures of the interesting places in Butterworth. Welcome to my Butterworth.

To see Butterworth map in detail click here